The steel building has been erected and is completed and ready for the panels and roofing sheets. The team assembled the building within a week, even through rainy weather. Varco Pruden supplied all of the pre-engineered metal building columns, beams, girts, and purlins. As well, any sheets or panels on the exterior are supplied by Varco Pruden. Great job all around! Check out a video of the erected metal building:
Leave a Reply